High Costs Bury AEP’s Carbon Burial Plan

Story submitted by Hugh McCullough American Electric Power has scuttled its pilot project to bury CO2 from its Mountaineer coal-burning plant in Red Haven WVa. The original projected cost, before unanticipated overruns, was $668 million. About 1/3 of the gross output from a plant would be required to capture, compress and inject the CO2 into…

About these ads